| River: | Chatooga |
| Section: | Section IV |
| Location: | Raven's Chute |
| Gauge: | 1.2' |
| Water Level: | Low |
| Difficulty: | IV |
| Accident Code(s): | Swim Into Undercut Trap |
| Injury Code(s): | Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal, Fatal |
| Age: | 16 |
| Experienced/Inexperienced: | Inexperienced |
| Private/Commercial: | Private |
| Boat Type: | Other |
| Number of Occupants: | 3 |
| Number of Victims: | 1 |
| Initial Report: | On May 29th Rachel Troy, 16, and her boyfriend attempted to wade across the Chatooga River just 20 feet upstream of Raven Rock Rapid. The river was running low, at 1.2', but despite this the pair lost their footing and were swept into the rapid. Ms. Troy was washed into an undercut rock where she became pinned under 8 feet of water. Her boyfriend, who survived, borrowed a PFD from nearby boaters and initiated a series of heroic rescue attempts. On his last try he dislocated his shoulder. Several area rescue squads worked for days but were unable to touch, much less release, her body. However, and underwater camera was used to pinpoint it's location.
The girl's distraught parents applied considerable political pressure to continue the recovery efforts. By doing this they collided head-on with defenders of this Wild and Scenic River who wanted to make certain that the area would not be damaged during these attempts. In late June, following pressure from South Carolina Senators Strom Thurmond and Earnest Hollings, a portable dam was carried into the gorge by convict labor and erected to divert the water. This involved drilling a number of small holes into the riverbed. Dennis Kerrigan, a long time rescue instructor and extrication expert, was flown down from Maine to assist. The effort was not successful. Later, after confusing reports from the rescue team and the Forrest Service regarding the actual location of the body, a second attempt was successfully made with a larger portable dam. Reportedly, no new holes were needed. |
| Report Status: | Completed |