Whitewater Flow Studies on Klamath River, Oregon
posted September 20, 2002
by John Gangemi
September 13th through 17th, 2002 American Whitewater conducted Whitewater Controlled Flow Studies
on two reaches of the Klamath River in Oregon: the sixteen-mile Class IV Hell's Corner Reach and
the five-mile Class IV reach between the Dam and powerhouse known as the JC Boyle bypass. The
studies are part of the relicensing process for PacifiCorp's Klamath River Hydropower Project, FERC
No. 2082. The license for the Klamath project expires in 2006.