gravel mitigation project


See Other Photo Versions

Description: The City of Renton was required to conduct mitigation for dredging that occurs at the mouth of the river. Their mitigation was to improve spawning habitat for salmon in the upper part of the river where it’s most important. They have been and will continue to dump 1,000 cubic yards of clean gravel below the bridge on river right. This "road" has served as a convenient access point for paddlers.

Author: Tom O'Keefe   River: Cedar, WA
Subject:  Rapid:
Date:  Level:
Size: 87.52KB  Format: jpeg
AW Photo ID: 3264   AW Reach ID:
Level Legend: Running Below Minimum Recommended Flow Above Maximum Recommended Flow Unknown
Descriptions of reaches with River Name in bold have been verified by a regional StreamTeam member.

State River Name/Section Class Level Rel. Level Updated
WA Cedar River— Landsburg bridge to Maplewood Roadside Park II 898 cfs   med 11/22 10:00

gravel mitigation project

Author Of Photo
Thomas O'Keefe
3537 NE 87th St.
Seattle, WA 98115
Phone: 425-417-9012

No Comments

Add a Comment


  (RSS)  
  (KML)help  
  (mobile)