bridge piling gauge


See Other Photo Versions

Description: The level is gauged by the river left bridge piling at the put-in otherwise known as "the unit". 0" is indicated by the line and stage is measured either or above or below this reference. Levels between -4" and 6" are good for first-time runs.

Author:   River: Canyon Creek, WA
Subject:  Rapid:
Date:  Level:
Size: 99.66KB  Format: jpeg
AW Photo ID: 3952   AW Reach ID:
Level Legend: Running Below Minimum Recommended Flow Above Maximum Recommended Flow Unknown
Descriptions of reaches with River Name in bold have been verified by a regional StreamTeam member.

State River Name/Section Class Level Rel. Level Updated
WA Canyon Creek (Lewis River Trib.)— 2 - Fly Creek to Merwin Reservoir IV+ 37 cfs   low 9/7 1:30

bridge piling gauge

Author Of Photo
Thomas O'Keefe
3537 NE 87th St.
Seattle, WA 98115
Phone: 425-417-9012

No Comments

Add a Comment


  (RSS)  
  (KML)help  
  (mobile)