Old browser warning

Site look funky?  Your browser is so old standards-based layouts and styling confuse it.  Consider updating.  One excellent option is Mozilla Firefox, versions of which are available for Linux, Mac and Windows.

Trail Bridge Dam and Powerhouse


See Other Photo Versions

Description: Trail Bridge Dam and Powerhouse is one the dams on EWEB's Carmen-Smith Hydropower Project (FERC P-2242) which includes three dams, and two powerhouses. The rated capacity of the total project is 124.5 MW.

Author: Thomas O'Keefe ©   River: McKenzie River, OR
Subject:  Rapid:
Date: 2006-10-02  Level:
Size: 2.30MB  Format: jpeg
AW Photo ID: 40111   AW Reach ID:
Level Legend: Running Below Minimum Recommended Flow Above Maximum Recommended Flow Unknown
Descriptions of reaches with River Name in bold have been verified by a regional StreamTeam member.

State River Name/Section Class Level Rel. Level Updated
OR McKenzie— 2. Carmen Reservoir to Trail Bridge Reservoir III-IV

Trail Bridge Dam and Powerhouse

Author Of Photo
Thomas O'Keefe
3537 NE 87th St.
Seattle, WA 98115
Phone: 425-417-9012

No Comments

Add a Comment