Bottom of put-in steps at Lilly Bridge at 26,000 cfs


See Other Photo Versions

Description: Ever run Lilly to Nemo in 6 minutes?

Author: James Locke   River: Clear Creek, TN
Subject: The river  Rapid: Lilly
Date: 2/6/04  Level: 26,000 cfs
Size: 118.91KB  Format: jpeg
AW Photo ID: 8654   AW Reach ID:
Level Legend: Running Below Minimum Recommended Flow Above Maximum Recommended Flow Unknown
Descriptions of reaches with River Name in bold have been verified by a regional StreamTeam member.

State River Name/Section Class Level Rel. Level Updated
TN Clear Creek— 3. Jett to Lilly II+(III) 14 cfs   low 12/4 19:30

Bottom of put-in steps at Lilly Bridge at 26,000 cfs

Author Of Photo
James Locke
Knoxville, TN

No Comments

Add a Comment


  (RSS)  
  (KML)help  
  (mobile)