Marmot Dam Removal Underway

Report

Account With an explosive charge at noon Marmot Dam removal was underway. The heavy equipment moved in a short time later to break up the concrete.
Time 2007-07-24 04:00:00 GMT
Reported Date 1185249600
River Reported Sandy
Reporter
Author Of Report
Thomas O'Keefe
3537 NE 87th St.
Seattle, WA 98115
Phone: 425-417-9012
River
Photos/Videos page 1 of 1

Marmot Dam Removal Underway

Detail Trip Report  Marmot Dam Removal Underway  Sandy, OR(4.70MB .jpeg)


No Comments

Add a Comment