| Account | Removal of the old bridge debris in Bridge Drop rapid begins with cutting up the old bridge. A highline logging cable is used to handle the large steel beams. Overhead cables are used to position the bridge beams. Steel beams from the old bridge are hoisted out of the canyon. Steel girders are hoisted out of the river canyon. |
|---|---|