Bottom of put-in steps at Lilly Bridge at 26,000 cfs

Report

Account Ever run Lilly to Nemo in 6 minutes? Ever run Lilly to Nemo in 6 minutes?
Time 2004-02-06 20:00:00 GMT
Reported Date 2/6/04
River Reported Clear Creek
Reporter
Author Of Report
James Locke
Knoxville, TN
River
Clear Creek [TN]
3. Jett to Lilly  II+(III)
med
01h22m
Reported Level 26,000 cfs
Photos/Videos page 1 of 2

Downstream Lilly Bridge at 26,000 cfs

Detail Trip Report  Downstream Lilly Bridge at 26,000 cfs  Clear Creek, TN(98.78KB .jpeg)

Bottom of put-in steps at Lilly Bridge at 26,000 cfs

Detail Trip Report  Bottom of put-in steps at Lilly Bridge at 26,000 cfs  Clear Creek, TN(118.91KB .jpeg)


No Comments

Add a Comment

  (RSS)  
  (KML)help  
  (mobile)