| Account | This is the second hole and the actual falls of the prefalls. Shortly down stream is the true falls. As one would expect the lower the flow the steeper are both the drops and the higher the flows the shorter the drop and the more powerful hydrolic action. Notice the 3 man high side. Picture perfect Hyside in a Hyside. After the falls get buried the pour over becomes alot more grabby. This is the first hole in the middle in the top of the prefalls. |
|---|---|
| Time | 2003-03-15 20:00:00 GMT |
| Reported Date | March 2003 |
| River Reported | Verde River |
| Reporter | Author Of Report Brady Black Flagstaff, AZ |
| River |
Verde [AZ]
|
| Reported Level | 2200 cfs |
No Comments
Users can submit comments.