Au Train - M94/Dam to below power house (0.6 mile)


Comment/Warn Report Level/Upload Photos

Au Train,

Disclaimer

M94/Dam to below power house (0.6 mile)

Usual Difficulty III-IV+ (may vary with level)
Avg. Gradient 100 fpm
Max Gradient 100 fpm


River Description

Quick Facts:

Location: 10 miles SW of Munising, or 30 miles SE of Marquette.
Shuttle Length: 0.8 mile. (See details in "Directions" Tab.)
Character: Possibly runnable dam, boogie water, and two wide, shallow steep slides.
Drainage area at put-in: approximately 80 square miles.

Put-in is approximately 751' elevation (or 777' above the dam).
Take-out is approximately 650' elevation.
Thus total elevation change is approximately 100' (or 127' including the dam).
This makes the 'effective gradient' 166 FPM (100'/0.6 mi), or 212 FPM including the dam.

An astounding pair of wide, steep slides, separated by some boogie water and a few wild waves and holes. This one is 'constructed backwards' -- the river is fairly narrow though most of the reach, and spreads wide as it comes into the two big falls. As a result, with enough water to make the big drops anything more than grungy, it is likely that the lead-in stretches will be wild and fast!

Addendum: As of spring, 2009, UPPCO is looking into the possibility of selling or abandoning this project (removing the dam). See details at the UPPCO Website.


StreamTeam Status: Not Verified
Last Updated: 2009-11-23 08:16:34

icon of message No photos found.


Gauge Information

Gauge Description:

Visual inspection only. Reach is normally dewatered due to hydro project, and will run only when 'lake' is full and inflow is high (or when, for whatever reason, the flume/powerhouse are not operating and water is allowed to spill through the natural channel).

Drainage area at put-in is approximately 80 square miles.

Report - Reports of Au Train M94/Dam to below power house (0.6 mile) and related gauges

Reports give the public a chance to report on river conditions throughout the country as well as log the history of a river.

Reports

No Reports Filed

WXPort

News





icon of message No guide books for this stream. If you know of a book that describes this stream please contact and advise the StreamTeam member for this run.

No Comments

Add a Comment

Rapid Summary

Mile Rapid Name Class Features (Legend)
0.3Upper FallsIVWaterfall
0.5Au Train FallsIVWaterfall

Rapid Descriptions

Upper Falls (Class IV, Mile 0.3)

The river swings to the left and passes under the penstock (pipe) for the second time (it first passes under it immediately after the dam). Immediately downstream of this second crossing, it drops down a steep sliding falls. The bedrock starts sloping a ways upstream, so get out to scout well before the penstock (if you have not throroughly scouted before you put on).



Au Train Falls (Class IV, Mile 0.5)

After a 'corridor' of lesser gradient (populated with smaller ledges, holes, and waves), the river takes a very slight bend to the right and a horizon line will be encountered. Au Train Falls starts out with a ledge of perhaps 5-6' vertical, fairly uniformly across the wide river. (This means the water will be shallow and grungy at the lip of the drop as well as the landing -- expect no 'cushion'.) The bedrock slopes away into a long series of slides, passing under a driveway (to the powerplant) and twisting off to the right. A few more ledges and holes will be encountered before the river tames down as it heads off through the woods.





 River Alert  
 State News  
 River Links  
 NWRI - Au Train M94/Dam to below power house (0.6 mile) (mobile)