Laurel Creek (New River trib. @ Quinnimont)

WV 41 bridge to New River at Quinnimont

Reach banner
DifficultyIII-IV+
Length5.2 mi
Avg Gradient155 fpm
GaugePiney Creek at Raleigh, Wv
Flow Rate as of 33 minutes
2.03 ftbelow recommended
Reach Info Last UpdatedFebruary 8, 2025

River Description

The put-in is just below the confluence of Chestnut Knob Fork near the second bridge crossing Laurel Creek on WV 41 coming from Quinnimont, This run has a even distribution of gradient. It is usually infested with trees. There is or was a six foot crumbling dam about mile from take-out that is best run on river left. It is not known how recent (2006) high water events have affected this run.


River Features

Put In

Distance: 0 mi
Access Point

Take Out

Distance: 5.3 mi
Access Point

No trip reports yet.