Chetaslina, |
|
| Usual Difficulty | V+ (may vary with level) |
|---|---|
| Length | 18 Miles |
| Avg. Gradient | 106 fpm |
| Max Gradient | 185 fpm |
Embick: "very steep, very fast, and very continuous." He says that it's been run exactly once, on July 30, 1983, by himself and Steve Jordan.
They didn't run just this river; they got provisions at the confluence with the Copper and floated down to Chitina, and Embick recommends that plan .