There currently is a painted gauge on the upstream river left side of the RT 94 takeout bridge.
3/30/2010:There were 4 stripes *exposed* 1.5 hours before we puton. 7 hours later when the 1st D was over all stripes were just under water. It had been a mission missing all the wood all day long. The creek had risen 8 inches. That was big for the wood level. there is probably about another 6 inches above the painted stripes till the big drain dumps into the creek is reached (next to the guage). If that drain is near or being touched by the creek I would not get on it unless the creek is known to be very clean.