Minimum flows are 150 cfs or a little more, year round.
Minimum flows will be 200 cfs (+/- 30 cfs) during the fall of 2009 till late December. This is due to some construction activity that required the use of a different outlet valve. Flows will drop back down to 150 cfs after the construction is completed.
There is no guage for this reach, however AW will be posting flow events on the release information calendar. When spills occur, flows will be estimated and reported manually. A real time flow gauge is scheduled to be installed in 2010.
| When | River/Gauge | Subject | Level | Reporter |
|---|---|---|---|---|
| Pit [CA] |
Pit 3 Reach |
250 cfs | Dave Steindorf |