Pit - (Pit 5) Pit 5 Dam to Pit 5 Powerhouse


Comment/Warn Report Level/Upload Photos

Pit,

Disclaimer

(Pit 5) Pit 5 Dam to Pit 5 Powerhouse

Usual Difficulty III+(V) (may vary with level)
Length 9 Miles
Avg. Gradient 45 fpm
Max Gradient 100 fpm

Upper Spillway Pit 5


Upper Spillway Pit 5
Photo by Dave Steindorf

Gauge Information

Name Range Difficulty Updated Level
Pit River at Big Bend
pge-PH27 800 - 4000 cfs III+(V) 03h47m 250 cfs (rc= -0.2 )


River Description

The Pit 5 reach offers both a class III run and a Class V run. The Class V run begins just below the Pit 5 Dam. The first rapid below the dam is very brushy. This rapid can be avoided by putting in below. If you do not wish to paddle the class III section, you can take out at the Bridge in Big Bend.

The Class III section begins at the bridge in Big Bend. Take out is just above the Pit 5 powerhouse.

Spring releases will be occurring on the Pit 3, 4 and 5 reaches as part of the new license that American Whitewater helped to negotiate. Real time flow information is now available on the American Whitewater Website since mid 2008. Also look to the release calendar on this page for scheduled flow releases. Look to the release calendar page

for release information in California and across the Country.

Other Information Sources:
SIERRA WHITEWATER, MARTIN, 1974


StreamTeam Status: Not Verified
Last Updated: 2008-12-27 01:33:01

Events

Calendar Control Date:
Calendar by Date by Title By Year

November 2009

S M T W T F S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
2
3
4
5

Events
  (iCal)