Learn about stars here

Souhegan, NH

Disclaimer

NH Rte. 101 Bridge to Wilton (Trash Dump rapids)

Class III
1.25 Miles
Avg Gradient 60 fpm
Max Gradient 75 fpm

Gauge Information

low
96
10/7 19:15

Min Sug. Level:  400 cfs

River Description

Technical info

Put in elevation........420'
Take out elevation......335'
Total drop..............85'
Average drop/mile.......60'
Distance................1.4 miles
River width average.....35'
River geology...........schists, small boulders, some ledge especially at
                        Horseshoe falls
River water quality.....neutral to good, clarity; neutral to dark.  Some
                        leaching from dump. 
Scenery.................Poor, upper reaches pass dump, lower reaches extend 
                        into the Wilton urban area.  Middle section good.
Wildlife................Occasional deer, merganzers, beaver

Directions

Put in

From Manchester NH take state route 101 west approximately 25 miles.
Just pass the town of Wilton state route 31 merges with 101 continue west pass this intersection approximately 1.2 miles.
After passing the Wilton recycling center pull into a small parking area on the left just before the bridge over the river.

Take out

Head back in the direction you just came from back to the intersection with route 101/31.
Take a left here on 31 north then take a right on Mill street at the bottom of the hill.
Pull into the parking lot for Label Art manufacturing company on your left.
Park on the downstream side behind the building.
StreamTeam Status: verified
Last Updated: 2008-09-30 20:43:14

Search Results

icon of message No photos found.

This topic does not exist yet

You’ve followed a link to a topic that doesn’t exist yet.

If permissions allow (as a AW Member, you may edit River Wiki, for example) you may create it by using the “Create This Page Button” below by hovering your mouse over the edit wrench.

If you don’t see a wrench, you don’t have permission to edit or edit is turned off.

If you don’t know what you are doing click on the sandbox and instructions link off the create page link.

Gauge

Gauge Description:

Note: USGS added a new gage on the Souhegan in the summer of 2008 about 2 miles downstream of the takeout in Milford.  This new gage a much better indicator of levels on the upper Souhegan than the Merrimack gage.  We will need to gather more information over time to correlate the gage to runable levels, however the 400 cfs level should be fairly accurate. It is a good indicator of how high the level might of been about 18
hours prior. The painted gage on the Upper Souhegan about 5 miles upstream is what is commonly used. If the upper section is running the lower will be also. Usually it can be run at a slightly lower level than the upper section can be run at.
 

 

Estimated chance (%) of finding the river runnable.
Month............% chance.................comment
 

January ............ 5%....Usually frozen
February............10%....Usually frozen.
March...............40%....Opens up about mid month.
April...............70%....Best chance in early April 
May ................30%....Best chance in early May. 
June................10%
July.................5%
August...............5%....Just a trickle 
September...........15%....Tropical storms and their remains
October........�....20%
November............40%....Fall rains, dormant trees 
December............35%....River starts freezing about Christmas.

Be aware this is averaged out over several years. The % chance refers to the probability of finding the river running on any given day. For instance a 5% probability for August means on average you can only expect 1-1/2 days of water. One year there could be 3 days in August with water, other years none. Spring levels are usually higher than fall levels. The river rises and falls rapidly because of the small steep watershed. An occasional summer storm could bring the river up for a day.
 

Souhegan River (Site Wlr-1) near Milford [ NH ]

Current Conditions

Stage Flow Updated
3.72 96 10/7 19:15

Station Graphs


Linked Reaches

Search Results

Level Legend: Running Below Minimum Recommended Flow Above Maximum Recommended Flow Unknown
Descriptions of reaches with River Name in bold have been verified by a regional StreamTeam member.

State River Name/Section Class Level Rel. Level Updated
NH Souhegan— Greenville to NH Rt. 101 Bridge II-III 96 cfs   low 10/7 19:15
NH Souhegan— NH Rte. 101 Bridge to Wilton III 96 cfs   low 10/7 19:15
NH Stony Brook— Route 31 to Wilton III-IV 96 cfs   low 10/7 19:15

Station Description

AW Gauge ID:11173
USGS Station:01093852
HUC:01070002
Latitude:
Longitude:
Class:

WXPort

News





Guidebooks



Classic Northeastern Whitewater Guide : The Best Whitewater Runs in New England and New York
$19.95

No Comments

Add a Comment

Rapid Summary

Mile Rapid Name Class Features (Legend)
0.2RecyclerII+Playspot
0.7Horseshoe FallsIII
1.0Wilton DamIV+Portage Waterfall

Rapid Descriptions

Recycler (Class II+, Mile 0.2)
This is a long rapid starting just around the bend past the route 101 bridge. The top of the rapid has a nice play spot. Eddy out on river right behind a 1' ledge. Here there is a hole turning more into a wave towards river center. The rest of the rapid picks along the rocks as it passes the Wilton recyling center on your right.

Horseshoe Falls (Class III, Mile 0.7)
Horseshoe falls is the toughest rapid on this section. It starts out with a series of ledge drops that can be run anywhere. Down below the river constricts from 40' wide to 18' wide into a narrow box canyon. The transition is by a horseshoe shaped drop. This drop is approximately 6' over a 40' distance. There are two routes the easiest one being far left. If you take the route on far right, catch the right side eddies as you prgress down. This will give you a better view as you scout your next move. There are also a few high penalty surfing waves you can access from these eddies. The bottom ledge does have a fairly large hole towards river center, it may upset you but not likely to hold you in.

Wilton Dam (Class IV+, Mile 1.0)
This is an "L" shaped dam approximately 8' in hieght. It is usually (and recommended) portaged on river left, however it has been run on the left and far right where there is a small break along a channel of the "L". Usually the boater launches off towards the right avoiding the hydraulic and shallows below. It is usually only deep enough to run in high water but high water also creates a larger hydraulic at the base of the dam. Scout carefully and consider the consequences here, portage if there is any doubt.


AW Membership Status

Please join AW.

To enjoy extra features of this website please register by clicking here.No permissions.

Volunteer Opportunities / Activities

StreamTeam

Mark LacroixDetails
...

Disclaimer Data Sources

EPA Surf This Watershed

USGS Page for This Station

NPS NH Rivers Inventory


Journal Archive Articles



 River Alert  
 State News  
 River Links  
  (RSS)  
  (KML)help  
  (mobile)  
 River Info (mobile)