You’ve followed a link to a topic that doesn’t exist yet.
If permissions allow (as a AW Member, you may edit River Wiki, for example) you may create it by using the “Create This Page Button” below by hovering your mouse over the edit wrench.
If you don’t see a wrench, you don’t have permission to edit or edit is turned off.
If you don’t know what you are doing click on the sandbox and instructions link off the create page link.
Check the Army Corps of Engineers discharge site for recent flow, stage, and rainfall data.
|
|||||||||||||||
Note: There is at least a two hour delay from the release times stated above until the water gets to the put in.
Flows on this section of the West are regulated by the Army Corps of Engineers flood control dam at the put in. Most of the time it is "run of the river". That means whatever comes in from above is passed through without any hold back regulation. Although, during high water event, the dam could be holding back water. Usually this water is slowly discharged several days after the event to allow boating during that time period.
WEST R NR TOWNSHEND, VT [ VT ] |
Current Conditions
Station Graphs |
| Level Legend: | Running | Below Minimum Recommended Flow | Above Maximum Recommended Flow | Unknown |
| State | River Name/Section | Class | Level | Rel. Level | Updated | |
|---|---|---|---|---|---|---|
| VT | West— Rock River (Newfane) to the Connecticut River | I-II | 185 cfs | low | 10/12 3:15 | |
| VT | West— Townsend Dam to Rock River (Newfane) | I-II | 185 cfs | low | 10/12 3:15 |
| AW Gauge ID: | 144 |
| USGS Station: | 01155910 |
| HUC: | 01080107 |
| Latitude: | 43.0511 |
| Longitude: | -72.7006 |
| Class: | -1 |
No Comments
Add a CommentNo permissions.
(KML)help