Gauge Description:
There is no real time gauge currently available, however, a real time gauge will be provided as part of the new settlement with SMUD.
Flows can be claculated from the Slab Creek Reservoir elevation. To determine the flow go to http://cdec.water.ca.gov/cgi-progs/queryF?slb&d=now&span=24hours and use the following conversion table for the reservoir elevation: <br />
<br />
1850.6 = 535 cfs <br />
1850.7 = 650 cfs <br />
1850.8 = 767 cfs <br />
1850.9 = 892 cfs <br />
1851.0 = 1025 cfs