Document - San Joaquin River Horseshoe Bend Reach Long-Term Operating Rules August 2019
Abstract
This Document presents the Long-Term Operating Rules (LTOR) for river flows for the Horseshoe Bend Reach on the San Joaquin River.Description
This document presents the Long-Term Operating Rules (LTOR) for river flows for the Horseshoe Bend Reach of the San Joaquin River, which is the 6.3mile bypass reach of Southern California Edison's (SCE or Licensee) Big Creek No.4 Hydroelectric Project.Document Information
Filename - San Joaquin River Horseshoe Bend Reach Long-Term Operating Rules August 20192754.pdf
Size - 12.30MB