This photo needs editing.
Difficulty I-III
Length 70 Miles
Gauge N/A
Flow Range
Reach Info Last Updated 01/17/2002 2:50 pm

River Description


Rapid Descriptions

Comments

No Gage

Gage Descriptions

Tell us about this gauge by leaving a comment.

Permits

NA

Directions Description


We have no additional detail on this route. Use the map below to calculate how to arrive to the main town from your zipcode.

No Accident Reports

Alerts

News

article main photo

Green River Boat Passage Officially Open! - UT

4/6/2017
Kestrel Kunz

American Whitewater staff traveled to Green River, UT in late March to meet with private water users and state agencies, and to participate in the official opening of the new boat passage through the Green River Diversion (Tusher Dam). Completion of the boat passage has freed the Green River from its last in-stream obstruction between the Flaming Gorge Dam and the confluence with the Colorado River – over 400 floatable river miles through iconic canyons and historic landmarks. It has a been a long process, and our work isn’t over yet! As your boating representative, American Whitewater will continue to work closely with the dam operators and Utah’s Division of State Lands (FFSL) to ensure that the boat passage meets the needs of the public during its inaugural year.

user-avatar

Matt Muir

Revisions

Revision #Revision DateAuthorComment
1191668 01/17/02 n/a n/a