This photo needs editing.
Difficulty III-IV
Length 7.9 Miles
Gauge N/A
Flow Range N/A
Flow Rate as of: 1 second ago N/A
Reach Info Last Updated 02/20/2002 11:43 pm

River Description


Gradient:
First mile below Canter Rd: 45 ft.
Next mile: 20 ft.
Next mile: 25 ft.
Next mile: 20 ft.
Next mile: 35 ft.
Next mile: 40 ft.
Next mile: 50 ft.
Last 0.8 mile to County Road 743: 40 ft.

Rapid Descriptions

Drainage areas:

Class - N/A Mile - 0
Rapid Thumbnail Missing

To be sure, this is an extremely small creek, making it tough to catch with boatable flows.

As calculated by USGS StreamStats 4.0 Beta software, drainages are as follows:

Location River Mile    Drainage
Canter Road (put-in) 0 0.36 square mile
Mount Olive Point Isabelle Road 1.6 2.76 sq.miles
Goodwin Schoolhouse Point Isabelle Road    3.54 8.48 sq.miles
State Route 222 4.9 10.8 sq.miles
State Route 743 (take-out) 7.0 17.7 square miles


Which is to suggest that there may be times theere is not enough flow at the listed put-in, but (if parking and access may be found) you may be able to put-in at someplace further down for a shorter but still worthwhile trip.

Comments

No Gage

Gauge Description


;

Directions Description


We have no additional detail on this route. Use the map below to calculate how to arrive to the main town from your zipcode.

;

No Accident Reports

Alerts

News

article main photo

New Hydro Project for Cuyahoga (OH)

2005-07-26 00:00:00-04
Thomas O'Keefe

The Cuyahoga River, the river that burned, played a pivotal role in the birth of the nation's river conservation movement. While restoration gains have been significant, a proposal for a new hydropower project on a dam targeted for removal would represent a signficant setback in ongoing restoration efforts and would delay for at least half a century any effort to bring back the lost whitewater that sits buried behind the Ohio Edison Gorge Dam. Paddler participation at upcoming scoping meetings is important.
user-avatar

Matt Muir