Flambeau, S.Fk.
B) FR149/Ten Mile Rd/Cedar Rapids Rd to Fifield/Hwy.70 (19.4 miles)
| Difficulty | I-II |
| Length | 19.4 mi |
| Avg Gradient | 4 fpm |
| Reach Info Last Updated | December 16, 2020 |
River Description
A few low-grade rapids (Little Cedar, Forest, and Divine) will be found on this reach.
River Features
Cedar Rapids
This lies just upstream of the listed put-in (Forest Road 149), and is the final (of only two) listed rapids on the prior reach. It may be possible to put-in above the listed put-in for this reach to start your run out with this rapids, but there is barely anything discernable via Satellite view to suggest it is any big deal.
Put In
Drainage: 159 sq.mi.
Drainage area at our listed put-in is approximately 159 sq.mi. (as calculated via USGS StreamStats Beta software). By our listed take-out, it has increased to 243 square miles (53% increase).
Little Cedar Rapids
Satellite view shows only very little here, suggesting it may be a low-grade (class I-II) boulder-garden rapids.
Forest Rapids
Topo maps show a 'Forest Rapids'. I cannot discern any apparent rapids on the satellite view. Probably a low-grade (class I-II) rifle or boulder-bed rapids.
Divine Rapids
Topo maps show a 'Divine Rapids' at this location. If you can 'divine' any rapids here (while looking at the satellite view), you are doing better than I am. I would conclude it is probably a low-grade (class I-II) set of riffles or boulder-bed rapids.
Take Out
Trip Reports
Log in to add a reportNo trip reports yet.