Penobscot, N. Branch

Big Bog Dam to Pittston Farm

DifficultyI-II
Length20.2 mi
Avg Gradientn/a
GaugeNorth Branch Penobscot River Nr Pittston Farm, Me
Flow Rate as of 30 minutes
87 cfsbelow recommended
Reach Info Last UpdatedApril 3, 2001

River Description

Lat/Longitude data are very approximate.


River Features

Put In

Distance: 0 mi
Access Point

Take Out

Distance: 20.8 mi
Access Point

No trip reports yet.