Gauge Description:

You use the same gauge at the same Piney River take out. You will need a 4.5 on the bridge. A new gauge will be installed as soon the TDOT replaces the present bridge.

Reports give the public a chance to report on river conditions throughout the country as well as log the history of a river.

No Reports Filed