Huron (Washtenaw)
B) Ann Arbor "Argo Cascades" (PnP)
November 11, 2011
Trip Report
| Reporter | Lee Green |
I biked past the site last week, and construction is nearly complete. All the rock weirs (made of large rectangular limestone blocks) are in place, and the bank trail is being worked on now. It's a series of pools about 20-30 yards long each, with a drop chute from each to the next. The chutes are obviously sized for easy passage of canoes, and the drops are small, maybe a foot or two.