Saint Vrain Creek, North

04. Apple Valley Bridge to Lyons

Reach banner

June 2, 2024

Tame at 194cfs

ReporterMatthew Castelli

A pretty float, but this flow level had us wondering where all the rapids went. Didn't notice much besides the constructed drops.