Contoocook
2. Hillsborough to Henniker(Freight Train Section)
November 13, 2008
Trip Report
| Reporter | Andy Stuart |
The minimum level here is quite low if you're looking for a III+ run. I ran it at a hair over 7 on the gauge and freight train was an easy III at best.