McKenzie
6. Leaburg Dam to Hayden Bridge
October 2, 2006
Trip Report
| Reporter | Thomas O'Keefe |
Diversion for the Walterville Powerhouse on the McKenzie River. This is part of the Leaburg-Walterville Hydropower Project (FERC P-2496) which includes two dams, and two powerhouses. The total rated capacity of the project is 23.20 MW.
Leaburg Powerhouse on the McKenzie River. This is part of the Leaburg-Walterville Hydropower Project (FERC P-2496) which includes two dams, and two powerhouses. The total rated capacity of the project is 23.20 MW.
Leaburg Dam on the McKenzie River. This is part of the Leaburg-Walterville Hydropower Project (FERC P-2496) which includes two dams, and two powerhouses. The total rated capacity of the project is 23.20 MW.
Boat launch at Hendrick's Park at Highway 126 mile 11.6.