McKenzie

6. Leaburg Dam to Hayden Bridge

Reach banner

October 2, 2006

Trip Report

ReporterThomas O'Keefe

Diversion for the Walterville Powerhouse on the McKenzie River. This is part of the Leaburg-Walterville Hydropower Project (FERC P-2496) which includes two dams, and two powerhouses. The total rated capacity of the project is 23.20 MW.
Leaburg Powerhouse on the McKenzie River. This is part of the Leaburg-Walterville Hydropower Project (FERC P-2496) which includes two dams, and two powerhouses. The total rated capacity of the project is 23.20 MW.
Leaburg Dam on the McKenzie River. This is part of the Leaburg-Walterville Hydropower Project (FERC P-2496) which includes two dams, and two powerhouses. The total rated capacity of the project is 23.20 MW.
Boat launch at Hendrick's Park at Highway 126 mile 11.6.