Sandy

3. Marmot Dam site to Revenue Bridge(Sandy Gorge)

Reach banner

August 19, 2017

Wood Issues

ReporterRobert Cruser

Ran this on August 19, 2017 and discovered multiple wood issues. They've obviously been there awhile but haven't seen them documented and they are significant. Rapid with the cave on the left a few drops above Boulder has wood solidly planted in the skinny left chute forcing a portage at low water. Wood is spanning the center chute at Boulder at the undercut, and the right chute looks worse than ever. Big chunk blocking the normal entrance to the regular middle run at Upper Revenue. Upper Revenue too low to run now anyway, and looks like some high water will likely move it along.