Black Moshannon Creek

Gorton Road to Rt. 53 Bridge(Black Mo)

Reach banner

May 3, 2011

Trip Report

ReporterRandall McFarland

Ran the final 3.8 miles twice on Sat. April 30 @ 10' on the putin bridge gauge, Beech Creek @ 8.3'
Ran Sun May 1 @ 8' , Beech Creek @ 7.6' These were good levels. Both Beech Creek readings were on a falling gauge. Cut out a river wide strainer just above the takeout. There was one other strainer on this section it is easily seen and easily avoided.
Rand