Doe
3. Highway 19E bridge @ Hampton High School to Covered Bridge Park - Elizabethton(Lower Doe)


This is the 1st rapid going into the horseshoe @ flood stage. At normal running levels there is about a 3' drop into a small hole.
Wesley R. Bradley
Bridge Rapid starting the beggining of the horseshoe
n/a
Bridge Rapid