Doe
3. Highway 19E bridge @ Hampton High School to Covered Bridge Park - Elizabethton(Lower Doe)
November 19, 2004
Trip Report
| Reporter | Wesley R. Bradley |
The dam is gone now, due to this flood!
This is the 1st rapid going into the horseshoe @ flood stage. At normal running levels there is about a 3' drop into a small hole.
Big Water!!!