Island Creek
2. Catoosa Bridge to Emory River
February 25, 2019
Trip Report
| Reporter | Teresa Gryder |
Learning from locals about this run, what I've heard so far: 0.4 is minimum, 2.0 is max (largely because other things are running when it gets this high), big water chops are required from 1.0 to 2.0. First time runs usually done at under 1 foot. Lots of slides makes for lots of holes.