Buffalo Creek (Maury Trib)

Effinger (VA 251) to Buffalo Forge (VA 70)

Reach banner

March 8, 2015

Trip Report

ReporterSteve Kvech

The gauge has been fixed. Recommended new bare minimum is 3.7 feet. That equates to about 1 foot of water over the bridge pier footing at Murat.

Trip Report – Buffalo Creek (Maury Trib) – Effinger (VA 251) to Buffalo Forge (VA 70) | American Whitewater