Passage Creek

2. Elizabeth Furnace to Waterlick (Route 55)

Reach banner

April 18, 2007

Trip Report

ReporterKen Dubel

USGS gauge is online. On 4/17/07 it was 9' on the route 55 bridge, about 4.7' / 290 cfs USGS.

Trip Report – Passage Creek – 2. Elizabeth Furnace to Waterlick (Route 55) | American Whitewater