Russell Fork

1. Bartlick Bridge (VA 611) to Garden Hole Road (Breaks Park)(Upper Russell Fork)

Reach banner

June 26, 2007

Trip Report

ReporterAndrea Jones

In October, 2006, the RF in Haysi was running around 700-800 cfs, which put about 1200 cfs into the Gorge with the output from the Pound river (they reduced the normal flow). We putin outside of Haysi, and had a very nice run (class II-III with two 3-4+ ft ledges back-to-back that were a little bony). We took out at Garden Hole after running the usual section from Bartlick bridge on down. It made for a trip of about 8 miles or so that was very enjoyable and very much preferable to the Pound river.

Trip Report – Upper Russell Fork | American Whitewater