Cascade

2 - Marble Creek Campground to Bridge nr. Skagit confluence

Reach banner

September 15, 2003

Removal of Bridge Debris

ReporterThomas O'Keefe

Removal of the old bridge debris in Bridge
Drop rapid begins with cutting up the old
bridge.
A highline logging cable is used to handle the
large steel beams.
Overhead cables are used to position the
bridge beams.
Steel beams from the old bridge are hoisted
out of the canyon.
Steel girders are hoisted out of the river
canyon.