February 3, 2026
| Reporter | Anthony Waldrop |
Engineered log jams have been installed from Satsop River Mile 8.5-11 (2021/22), Satsop River Mile 2.5-5.0 (2024/25), and Satsop River Mile 0-2 (2021-2025). Use caution when navigating reaches with engineered and natural log jams.
For additional information, contact Grays Harbor Conservation District at awaldrop@graysharborcd.org.