Amity Creek
Skyline Pkwy to Lester River (2.4 miles)
October 11, 2011
Trip Report
| Reporter |
This is a set around the 7th bridge. Looks to be 3 (10-15ft) drops in succession
October 11, 2011
| Reporter |
This is a set around the 7th bridge. Looks to be 3 (10-15ft) drops in succession