Blackoak Creek
Rt. 227 to Town Creek
January 8, 2015
Trip Report
| Reporter | Wes Brown |
Wood status as of 12/28/2014: 6-7 portages required at a level of +2 inches on the Blackoak put-in gauge
January 8, 2015
| Reporter | Wes Brown |
Wood status as of 12/28/2014: 6-7 portages required at a level of +2 inches on the Blackoak put-in gauge