Money Creek
Upstream of Money Creek Rd. Bridge


Takeout bridge from upstream river right. This is the level when the Sky at Goldbar was at 18,000 with heavy winter rain (level would respond differently during snow melt). Look for flows of about 1" up on the bridge pillar. Run is a bit bony at 0" and a bit pushy at 2".
n/a