Lemon Creek
Upper Quarry to Costco
July 4, 2007
Trip Report
| Reporter | Ramon Imel |
Blink and you missed construction of this 'private' bridge accessing the new quarry operation on the Lemon Creek Detention Facility side of the river.
A three pronged obstacle wedged hard in the middle of a favorite drop.
The hazard approaches.
Hole at friendly level above hazard. Later in the season TS had 8 rolls in 8 seconds before he washed out upside down.