Klamath
02. Moonshine Falls Access to Spring Island(Big Bend Run)
August 20, 2023
Site Visit to Sidecast Slide and JC Boyle Dam
| Reporter | Thomas O'Keefe |
| Flow | Too Low |
In advance of dam removal, and in anticipation of restored flow to the Big Bend run, Klamath River Renewal Corporation will be fracturing blast rocks that are in the river channel as a result of the canal construction when the hydropower project was built in the 1950s.