Klamath
02. Moonshine Falls Access to Spring Island(Big Bend Run)

August 20, 2023
| Reporter | Thomas O'Keefe |
| Flow | Below Recommended |
In advance of dam removal, and in anticipation of restored flow to the Big Bend run, Klamath River Renewal Corporation will be fracturing blast rocks that are in the river channel as a result of the canal construction when the hydropower project was built in the 1950s.