Klamath

02. Moonshine Falls Access to Spring Island(Big Bend Run)

Reach banner

July 14, 2020

Big Bend Flow Study

ReporterThomas O'Keefe
Gauge Reading1000 cfs

A flow study on the Big Bend reach of the Klamath River in July 2020 evaluated anticipated summer flows of 1000 cfs following dam removal. The river was technical but boatable at this level. Rafting was more challenging than kayaking.