Piedra

01. Upper Piedra CG to 1st Fork Bridge(Second Box of the Piedra)

Reach banner

June 9, 2026

Strainer across whole river 1/2 mile from the put-in

ReporterBenjamin Banet
FlowToo Low

Just hiked down a mile from the trailhead- saw on large pine strainer across whole river 1/2 mile from the put-in or so. Sure there'll be more further in the canyon after large fall's rains