Big Bear
Highway 8 Bridge (West of Deary) to Kendrick High School


This is the scene looking downstream from the put in bridge, about 100 yards downstream of Hwy 8. This is considered a relatively high flow, but was a good level.
Kevin Colburn
Jan 14, 2006
Put In