Fall River
2. Concrete CCC Bridge to Kirkham Bridge(Lower Run)
June 11, 2025
900 to 1000
| Reporter | Daniel Cottam |
At this flow from the put in to the take out at 3800 took 2 hours. That is without stopping to scout the dam. At this level all sides of the dam ran well. However, I would not run the right side in a raft at this level since less water goes over that side and the cement there is rough. Kayaks ran it great. It must have been a low water year since it was not running at 1400 as required by the permit. That being said it was still glorius and splashy