Fall River

2. Concrete CCC Bridge to Kirkham Bridge(Lower Run)

Reach banner

June 11, 2025

900 to 1000

ReporterDaniel Cottam

At this flow from the put in to the take out at 3800 took 2 hours. That is without stopping to scout the dam. At this level all sides of the dam ran well. However, I would not run the right side in a raft at this level since less water goes over that side and the cement there is rough. Kayaks ran it great. It must have been a low water year since it was not running at 1400 as required by the permit. That being said it was still glorius and splashy