Fall River

2. Concrete CCC Bridge to Kirkham Bridge(Lower Run)

Reach banner

May 13, 2021

Trip Report

ReporterDaniel Cottam

Ran this on May 7th at 1600 and this really took away all the rock garden features and turned it into large wave trains. There was no wood and there still was lots of snow on the north facing aspects of the river. At this flow the diversion dam has no recirculation on either side and that makes the left side super fun to run with the tall standing wave. We did it in multiple types of craft with no problem. Bob's revenge is super fun at the end at this flow with a huge standing wave. Take out at the power plant.