Paint
Hemlock Rapids: Hemlock River to Bates Amasa Rd. (5.6 miles)
January 10, 2006
Trip Report
| Reporter | Adam Vollmar |
I did an extended trip that included this stretch in the summer of 2005 when water levels were extremely low. We dropped in at the campgound off of FS-347 and ended at Bates-Amasa bridge (CR-643). It took around 5 hours (aside from the rapids, we floated most of the way) but would be much quicker at higher water. The two sections of Hemlock Rapids were a blast and in the Spring would be great.